Using pacepro and estimated finish time at the same time

It looks like I can use the built in finish time estimator or pacepro but not both at the same time. 

It looks like I need to download an estimated finish time data field from connect Iq in order to use both at the same time. 

Anyone know if it's possible to use pp and the built in estimated finish time tool at the same time? 

I see lots of older posts about this, not sure if it's possible to do in 2025 without adding a data field?