Hi all,
On the weekend I participated in an off road Triathlon: Swim, T1, Cycle, T2, Run. During the Cycle I pressed the lap button signifying the end of the cycle way too early. The 28km Cycle is only 8km and I have a 20km T2!
I'm wondering if anyone can point me in the direction of how I can edit the Garmin Connect FIT file? I've tried converting to CSV via this site: http://garmin.kiesewetter.nl/ but when I move the T2 event to later in the file, fix the time, the lat/long, etc so it all looks like it should be OK, when converted back to FIT, Garmin connect displays an error when I try to upload again.
I contacted Garmin Support but this isn't something they get involved with.
This is how the event was recorded on my 920XT:
Swim: 35 mins 5 seconds
T1: 3 mins 12
Cycle: 25 mins 27 secs
T2: 1 hr 3 mins 44 secs
Run: 53 mins 13 secs
Total time 3 hours, 0 minutes and 41 seconds
If possible, I want T2 to be the officially recorded time of 1 min 28 secs, so the remaining T2 time of 1 hour, 2 min and 16 secs is recorded as the cycle. I'd like the event to look like this:
Swim: 35 mins 5 seconds
T1: 3 mins 12
Cycle: 1 hr 27 mins 43 secs
T2: 1 min 28 secs
Run: 53 mins 13 secs
Total time 3 hours, 0 minutes and 41 seconds (same total time)
This is the event:
https://connect.garmin.com/modern/activity/3688552545
The FIT file should be accessible here:
Is this something that is achievable? Thanks in advance, Arran