BAsecamp total time calculations for route issue

Former Member
Former Member
When I plan a route for 2014 (this year) BC calculates the total route time correctly... say 2 hrs. and 50 min as an example. When I plan the same route for 2015 (next year) on the same date BC returns a total time en route of 2892 hrs. and some 9 minutes. This is consistent for all my routes planned for next year. I am running BC 4.4.4 on windows 8.1 on a leveno ideapad z400 laptop. Does anyone have any suggestions on a way to fix this?

Thanks
Roy